Detroit stair railings
Repairs for railings that rock, lean or have rusted through at the base: posts reset in sound concrete or moved to new plates, loose brackets re-anchored, and broken welds, pickets and balusters fixed. Where the rail above is still good, it is kept.
Around Detroit, the most common outdoor railing failure starts at the bottom of a post. Iron railings on concrete steps were often set by pouring the post straight into a hole in the step. Salt and de-icer from the walk wash into that joint, the steel rusts, and rust takes up more room than the metal it replaces. The swelling post pushes the concrete apart from inside until a chunk spalls off the corner of the step and the rail starts to rock. Winters here bring enough freezes and thaws to speed the whole process along.
The rusted stub is cut off above the damage and the bad concrete is chipped back to a solid edge. Depending on what is left, the post is spliced with new steel and set into a fresh core-drilled hole with non-shrink grout, or moved onto a bolted base plate or a flange on the side of the step where the concrete is sound. The step corner is patched, the joint is capped so water drains away from it, and the steel is primed and painted. Most of the time the railing above the base is reused.
Not every loose rail is iron in concrete. Posts bolted into brick piers loosen when the mortar around the anchor crumbles; the pier is repointed and the anchor reset in solid brick. Wood porch posts rot at the base where water sits on the floor. Inside, a handrail bracket pulls out of old plaster, or a newel was only nailed to the floor. Broken welds, cracked castings and missing pickets on wrought iron are welded or replaced to match.
Loose rails are a standard rental write-up. Detroit's checklist fails rotten, leaning or collapsing porches and stairs; Hamtramck wants rails that take a 200-pound sideways push; Dearborn allows 90 days to fix cited items, and Southfield gives 30 days to pull permits and make repairs. Warren and St. Clair Shores run their own rental inspections too. Whether a repair needs a permit is a question for your building department, so ask before the work starts. If a fixed rail still falls short of the rules, the code upgrade is quoted beside the repair, and a rail past saving is quoted as a new front-step railing.
How long does it take? Many repairs take a few hours. Re-setting posts in fresh grout or patching a spalled step can need a return visit once the material has cured.
These often come up on the same staircase or the same visit:
Missing handrails added, wide gaps closed and low guards raised to pass rental, point-of-sale and buyer inspections.
Read more →Custom steel railings built to your steps, and new sections matched to old porch iron, including historic-district homes.
Read more →Railings for concrete front steps, brick porch piers and wood porches, anchored to hold up through Michigan freeze-thaw winters.
Read more →Written quote
A quick description is enough to start.
We will call to set up a time to measure. To talk sooner, call (313) 497-5628
Something went wrong sending your request. Please call (313) 497-5628 and we’ll take the details over the phone. Your answers are still filled in below if you’d rather try again.